A01 - completed the installation of vertical and horizontal frame elements of the 11th and 12th floors; completed the installation of light wells and backfilling of the pit sinuses; completed the installation of the second level of the tower crane anchorage; performed the installation of masonry - 13% completion; began the installation of ventilation and smoke protection systems; purchased a porcelain stoneware slab and an aluminum system for a hinged ventilated facade.

A02 - completed the installation of monolithic structures of the 2nd floor; completed the vertical waterproofing of the A02 building; performed the installation of a retaining wall and light wells - 63% completion; a complex of works on water reduction was being carried out.

Parking P02 - a complex of works on water reduction was being carried out; installation of parking piles was completed.

Construction site organization - installation of KTP-2 has been completed to provide power supply to the construction mechanisms of the buildings of the III launch complex (buildings A03-A04);

installation of open warehouses 2 and 3 for storing ceramic blocks for building A02 and reinforcing bars for buildings A01-A02 has been completed; 47 machines of ceramic blocks for building A01 and 12 machines of mineral wool insulation for the facades of building A01 have been accepted