A01 - completed the installation of vertical and horizontal frame elements of the 9th and 10th floors; completed 50% of the installation of light wells; continued the backfilling of the pit sinuses - 92% complete; completed the 1st level of tie-in and tower crane extension; performed the masonry installation - 6% complete; completed the tender and determined the contractor for the ventilation and smoke protection systems.

A02 - completed the installation of the basement floor slab and vertical elements of the 1st and 2nd floors and the 1st floor floor slabs; completed the backfilling of the foundation sinuses of the building A02; performed vertical waterproofing of the basement floor - 67% complete; performed the backfilling of the pit sinuses - 57% complete; performed a complex of water reduction works.

Parking lot P02 - installation of the water lowering system has been completed; the second stage of excavation for the installation of test pile bushes has been completed; installation of test bushes has been completed and soil testing has been carried out; installation of parking piles has begun - 11% completion.

July
2026