A01 - completed the installation of vertical and horizontal elements of the 7th floor frame, completed 67% of the installation of vertical and horizontal elements of the 8th floor; completed 67% of the installation of vertical elements of the 9th floor; completed the installation of the retaining wall; continued the backfilling of the pit sinuses - 83% completed; mounted window and balcony block samples; completed the tender for the installation of masonry and started the work.

A02 - completed the installation of vertical elements of the basement floor of the building A02; performed horizontal structures of the basement floor - 27% completed; performed backfilling of the foundation sinuses of the building A02 - 63% completed = 0.63 m2 and ; performed a complex of works on water lowering.

Parking lot P02 - completed the first stage of the development of the pit for the installation of a water lowering system; The second stage of excavation for the installation of test pile bushes was carried out - 79% completed; the tender for determining the contractor for the test pile bushes and parking piles was completed.

May
2026